Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Industrial framing in Bradford and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Bradford addresses use the Bradford West Gwillimbury Building Division. Full-size colour drawings and supporting documents must remain on site. The permit placard must be displayed conspicuously during construction.
Bradford assigns inspections at the stages listed in the permit package, so the industrial framing package follows the listed inspection order.
At the address, we verify loads, wall lines, openings and equipment clearances. We also confirm the current municipal approval status and the route for steel or wood framing, lifts and controlled access. That route is checked without assuming municipal road space is available.
The quote separates occupancy, loads, wall types, openings, equipment, services, phasing and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
Group F, Division 1 is high-hazard industrial occupancy, while Divisions 2 and 3 are medium- and low-hazard. Each uses different construction and fire-protection requirements, so a wall assembly that passes review in one division can fail it in another. Low-hazard occupancy is capped at 50 kilograms per square metre or 1,200 megajoules per square metre of combustible content. So a change in what your process stores on site can shift your building into a different division partway through design.
A light production fit-out differs from a heavy equipment platform in loads, vibration and foundation demand. So two jobs that look identical on a floor plan can carry two different structural scopes. Process equipment, cranes, tanks and platforms can impose loads separate from the building's own framing. That means a coordinated Part 4 design has to size those members before we quote them.
Clean, wet, corrosive, refrigerated and high-temperature processes each require different material and envelope specifications. So a wash-down room and a dry storage room behind the same wall can need different fasteners and cladding.
A maintenance catwalk only qualifies for its specific Code treatment when its use and construction meet the stated provisions. Guards and elevated work surfaces still need designing for the actual loads and access they carry. So a walkway sized for foot traffic cannot double as a platform for stored materials.
A machine bracket fixed to a non-loadbearing steel-stud wall can look secure while asking a partition to carry a reaction it was never designed for. Vibration and repeated use expose the mistake after commissioning. We separate equipment support from partition framing and obtain the approved structural detail first.
Part 9's prescriptive steel-stud tables cover non-loadbearing walls only, so anything carrying machinery or platform load moves onto the approved Part 4 design instead of a standard span table. Group F, Division 1 sits entirely outside Part 9, which means every member and connection in a high-hazard occupancy is sized by engineering, not a lookup table.
Openings for equipment, ducts, shutters and conveyors each need their own approved structural and fire-protection detail, because a generic-sized opening can undersize the header or miss the protection required at a compartment boundary. Guards and elevated work surfaces get designed for the loads and access they will actually see. So a platform built for occasional inspection is not the same connection schedule as one built for daily material handling.
Municipal building officials enforce the Building Code on your site. As the permit holder you are responsible for requesting the inspections framing depends on. So we keep anchors, welds or bolts and rated construction visible until that review happens.
Your equipment suppliers inherit the support reactions, openings and alignment points we verify. Mechanical and process trades inherit the protected wall penetrations we leave behind, fire-protection trades inherit the hazard classification and compartments we establish. Your operations team inherits the platform loads, guards and egress the framing was designed to support.
Send your process description, materials, hazards and occupancy classification, plus whatever existing structural survey you have for the slab, roof, cranes and foundations. Include equipment loads, vibration criteria, openings and support details, along with your fire compartment and protected-penetration plans. Tell us about shutdown windows and access restrictions, so nothing about your operating plant gets assumed.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Bradford work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Bradford West Gwillimbury, not Simcoe County, administers permits and inspections for Bradford addresses.
The issued permit package and the work assigned to that inspection stage must be ready. Display the permit placard and keep the full-size colour drawing set plus supporting documents on site.
Unresolved access approval or an incomplete material route can delay mobilisation. On a new subdivision lot, use the individual lot-grading plan as part of the site setup. The quote also needs occupancy, loads, wall types, openings, equipment, services, phasing and access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Bradford. See all framing in Bradford →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send your process description, hazards, occupancy classification and whatever structural survey you already have for the slab, roof, cranes and foundations. We will confirm what Group F division applies, flag any missing load or clearance information, and give you a scope you can actually price against.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides industrial framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.