Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Warehouse framing in Bradford and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Bradford addresses use the Bradford West Gwillimbury Building Division. Full-size colour drawings and supporting documents must remain on site. The permit placard must be displayed conspicuously during construction.
Bradford assigns inspections at the stages listed in the permit package, so the warehouse framing package follows the listed inspection order.
At the address, we verify wall lines, tall-wall support, openings and equipment interfaces. We also confirm the current municipal approval status and the route for steel or wood framing, lifts and delivery access. That route is checked without assuming municipal road space is available.
The quote separates wall height and length, loads, openings, equipment, fire separations, lifts and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
A low-hazard industrial occupancy carries combustible content no greater than 50 kg per square metre or 1,200 megajoules per square metre of floor area under the Ontario Building Code. Cross that threshold and you are into medium-hazard territory, which changes the permitted construction and fire-safety requirements under Part 3. So we confirm your stored commodity and combustible load before we price a single stud wall.
Ambient, refrigerated and freezer warehouses call for different envelope, vapour-control and service-penetration details. So the same wall gets different sheathing and vapour barrier work depending on which side holds product below freezing. Get that wrong and you are chasing condensation and ice buildup behind the sheathing within a season.
A warehouse office is a subsidiary or mixed-use area under Part 3, and its separation and egress depend on the approved Code analysis, not on habit. Push an office into open storage space without that analysis and your egress path may no longer satisfy the occupancy it now serves.
Rack-supported structures, independent racks and conventional framed mezzanines are not interchangeable systems, even when they look similar from the floor. A conventional mezzanine stands on its own post-and-beam frame; a rack-supported structure ties that same platform back into the racking itself. So your rack supplier and your framer need to agree on who is carrying the load before either one starts building.
A partition or rack anchor drilled into an unknown slab zone can hit embedded services or load an area never designed for that reaction. The slab looks uniform from above, so the risk is invisible until drilling or movement exposes it. We verify structural and embedded-service information before locating anchors.
Part 9's prescriptive steel-stud provisions apply only to non-loadbearing walls. Interior non-loadbearing steel studs need at least 0.46 mm of base-steel thickness under that provision. So the gauge on your delivery ticket has to match what the wall is actually asked to carry. Exterior runners attach to their supporting structure at no more than 300 mm on centre.
Anything past what Part 9 covers, meaning structural framing, rack support, guards or equipment reactions outside its prescriptive limits, needs the applicable Part 4 design instead, because a prescriptive stud table was never sized to carry a rack reaction. Door, dock, conveyor and fire-shutter openings each get their own approved jamb, header and closure support details, since a standard header is not built for a rolling fire shutter.
Municipal building officials enforce the Ontario Building Code, and the permit holder is responsible for notifying the building department for required inspections. So that call does not fall through the cracks between trades. Rack and equipment installers inherit the slab bearing capacity and anchor zones we leave behind. Sprinkler and fire-alarm trades inherit the storage height and compartment geometry the framing sets under Part 3.
Door and loading-equipment trades inherit the framed openings and approach clearances we build, so a dock leveler or a rolling door fits the opening it was ordered for. Operations inherits the designed occupancy and egress conditions on handover day, which is why we keep every anchor visible until the inspector has signed off.
Send your commodity, combustible-content, storage-height and occupancy information first; that is what sets your OBC classification, and everything else follows from it. Add existing survey, column grid, slab and roof-structure information, plus your rack, conveyor, dock, equipment and operations layouts. Include fire compartment, sprinkler, egress and protected-opening plans along with your wall, mezzanine, guard, anchor, post, beam and equipment-support details. Tell us who owns phasing, inspection and closeout, so nothing gets assumed.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Bradford work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Bradford West Gwillimbury, not Simcoe County, administers permits and inspections for Bradford addresses.
The issued permit package and the work assigned to that inspection stage must be ready. Display the permit placard and keep the full-size colour drawing set plus supporting documents on site.
Unresolved access approval or an incomplete material route can delay mobilisation. On a new subdivision lot, use the individual lot-grading plan as part of the site setup. The quote also needs wall height and length, loads, openings, equipment, fire separations, lifts and access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Bradford. See all framing in Bradford →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, your stored commodity and combustible-content information, the property address and your target start window. We will confirm the OBC occupancy classification, flag any missing structural or coordination decision, and give you a scope you can actually price against.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides warehouse framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.