Industrial framing across Toronto, the GTA and the Golden Horseshoe, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from industrial framing

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from classification to handoff

  1. Classify. Confirm process, materials, hazards, combustible content, equipment loads and major-occupancy classification, so your framing starts from the correct Group F division instead of an assumption.
  2. Survey. Survey the structure, slab, roof, cranes, pits, services, exits and operating clearances, so a pit or crane rail you forgot about does not surface after material is ordered.
  3. Confirm loads. Obtain structural reactions, vibration criteria, equipment supports and openings, so every member is sized to what it actually carries.
  4. Map protection. Identify fire compartments, hazardous rooms and required noncombustible construction, so the boundaries your fire-protection trade needs are marked before framing starts.
  5. Sequence. Sequence temporary works so the structure and your operation stay stable during alterations, so production is not stopped for framing that could have been phased around it.
  6. Frame. Install framing, connections, guards and service openings to the issued structural and process drawings, so what gets built matches what was engineered.
  7. Hand over. Keep anchors, welds or bolts, rated construction and penetrations visible for review, then hand over verified loads, clearances and protected boundaries to your commissioning team.
Industrial Framing being framed on site by Timberr Framing

Ready to price industrial framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why Timberr is different on this scope

We coordinate framing with process reality. Equipment loads, hazardous boundaries, structural openings, elevated work surfaces and active-plant access are reviewed together before fabrication or shutdown planning.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed industrial framing work is backed by our workmanship warranty. The same team that reviews the risk remains accountable through the handoff.

Industrial Framing by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
How It Gets Built

More about industrial framing

Understanding industrial framing

The occupancies and conditions that change the work

The occupancies and conditions that change the work

Group F, Division 1 is high-hazard industrial occupancy, while Divisions 2 and 3 are medium- and low-hazard. Each uses different construction and fire-protection requirements, so a wall assembly that passes review in one division can fail it in another. Low-hazard occupancy is capped at 50 kilograms per square metre or 1,200 megajoules per square metre of combustible content. So a change in what your process stores on site can shift your building into a different division partway through design.

A light production fit-out differs from a heavy equipment platform in loads, vibration and foundation demand. So two jobs that look identical on a floor plan can carry two different structural scopes. Process equipment, cranes, tanks and platforms can impose loads separate from the building's own framing. That means a coordinated Part 4 design has to size those members before we quote them.

Clean, wet, corrosive, refrigerated and high-temperature processes each require different material and envelope specifications. So a wash-down room and a dry storage room behind the same wall can need different fasteners and cladding.

A maintenance catwalk only qualifies for its specific Code treatment when its use and construction meet the stated provisions. Guards and elevated work surfaces still need designing for the actual loads and access they carry. So a walkway sized for foot traffic cannot double as a platform for stored materials.

What belongs in the industrial framing scope

What belongs in the industrial framing scope

Wood, steel and mixed-material framing are all permitted, but only within the occupancy, size, fire-safety and structural rules that apply to your division. So the material on your quote follows the classification, not habit. Structural members and connections that support machinery or platform loads follow the approved Part 4 design. That means your equipment supplier's reaction loads have to be in hand before we size a beam.

Member size, span, equipment reaction, vibration and connection type control how much structural quantity the job carries. New openings, pits, platforms, crane interfaces and foundations each add their own structural investigation. So one added doorway near a crane rail is not priced like a doorway in an open bay. A shutdown window or live-plant access restriction adds phasing neither of us can skip if your plant keeps running around us.

The mistake we want found before the work begins

The mistake we want found before the work begins

A machine bracket fixed to a non-loadbearing steel-stud wall can look secure while asking a partition to carry a reaction it was never designed for. Vibration and repeated use expose the mistake after commissioning. We separate equipment support from partition framing and obtain the approved structural detail first.

Member and connection decisions that affect the result

Member and connection decisions that affect the result

Part 9's prescriptive steel-stud tables cover non-loadbearing walls only, so anything carrying machinery or platform load moves onto the approved Part 4 design instead of a standard span table. Group F, Division 1 sits entirely outside Part 9, which means every member and connection in a high-hazard occupancy is sized by engineering, not a lookup table.

Openings for equipment, ducts, shutters and conveyors each need their own approved structural and fire-protection detail, because a generic-sized opening can undersize the header or miss the protection required at a compartment boundary. Guards and elevated work surfaces get designed for the loads and access they will actually see. So a platform built for occasional inspection is not the same connection schedule as one built for daily material handling.

Plans, sequencing, and site decisions

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Municipal building officials enforce the Building Code on your site. As the permit holder you are responsible for requesting the inspections framing depends on. So we keep anchors, welds or bolts and rated construction visible until that review happens.

Your equipment suppliers inherit the support reactions, openings and alignment points we verify. Mechanical and process trades inherit the protected wall penetrations we leave behind, fire-protection trades inherit the hazard classification and compartments we establish. Your operations team inherits the platform loads, guards and egress the framing was designed to support.

Framing industrial space across the GTA

Framing industrial space across the GTA

Municipal building officials enforce the same Ontario Building Code whether your facility sits in an established industrial park or a newly rezoned employment lands parcel, so classification happens the same way everywhere. But the survey of structure, slab, roof, cranes and pits changes with what is on your site. Your shutdown window and access restrictions decide how framing gets phased, not the municipality. So an occupied plant and a shell building can call for very different sequences under the same Code.

What to send for a useful industrial framing quote

What to send for a useful industrial framing quote

Send your process description, materials, hazards and occupancy classification, plus whatever existing structural survey you have for the slab, roof, cranes and foundations. Include equipment loads, vibration criteria, openings and support details, along with your fire compartment and protected-penetration plans. Tell us about shutdown windows and access restrictions, so nothing about your operating plant gets assumed.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Industrial Framing, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Industrial Framing FAQ

Will industrial framing hold my construction schedule?

It protects the shutdown schedule when classification, equipment reactions and structural openings are approved before work starts. We do not choose framing from a generic plant layout.

What usually delays industrial framing after mobilisation?

Unapproved equipment support and interrupted hazardous-room boundaries create the highest-consequence rework. We resolve both before closure.

What do the following trades inherit from this work?

Operations receive approved supports and compartment boundaries built around the actual process, with changes documented before restart.

Who owns a framing conflict found on site?

Timberr owns documenting the conflict, protecting the affected work and getting it to the responsible designer or consultant. We do not hide an unapproved field change inside the handoff.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request an industrial framing quote

Send your process description, hazards, occupancy classification and whatever structural survey you already have for the slab, roof, cranes and foundations. We will confirm what Group F division applies, flag any missing load or clearance information, and give you a scope you can actually price against.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call