Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Custom home framing across Toronto, the GTA and the Golden Horseshoe, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing is a dependable and professional team. Their custom home framing work is always top-notch, and the communication is clear throughout the process.
From start to finish, Timberr Framing provided a seamless project execution for our custom home framing. The team was organized and efficient, and the communication was clear throughout.
Our custom home project required a framing company that was knowledgeable and experienced. Timberr Framing delivered, professional and knowledgeable, with no delays in the framing inspection process. You have gained a customer for life!
Timberr Framing did an incredible job on our custom home. They worked efficiently without sacrificing detail, and the structure turned out flawless.
Prescriptive dimensional-lumber framing only applies when the species, grade, spacing, spans and loads all fit inside the Part 9 tables. So the moment one condition falls outside those tables, the load path needs an engineer's design instead of a table lookup.
Ontario recognizes I-joists as lightweight pre-engineered floor systems, but the structural design and supplier layout establish where they can be used, not a generic span claim. So your floor package follows the layout that supplier issued.
LVL, LSL and PSL are engineered wood categories, and you cannot read their capacity off the depth or the way a member looks. It comes from the design and product documentation, so we frame to the schedule the engineer specified, not to what a beam appears able to carry.
Prefabricated roof trusses replace site-cut rafters wherever the approved truss design and layout call for them. Field alterations are prohibited unless the truss design specifically permits them. So a truss that does not fit gets a design answer, not a site cut.
Site-framed rafters stay available within the snow-load, species, grade, spacing and span limits set out in the roof span tables. But a heavy roof finish is a separate loading case that the Code answers with reduced spans or reduced spacing. So the roofing material you choose can move the rafter layout underneath it.
The framing package begins at the foundation and sill interface and continues through beams, floors, walls and roof until the structure sits visible for inspection before insulation goes in. So you see exactly where our scope starts and stops. Permit drawings must be dimensioned, signed and dated, and structural content sealed by an engineer carries an identified assumption of professional responsibility. So your quote can point to the page that answers a question.
Floor area and storey count move the quantity of material and the loads every member carries. Long spans and concentrated roof or beam loads move how much of the frame has to be engineered members and connectors rather than standard stock. Large openings move lintel size and side-stud count, and complex roof geometry or heavy roof finishes move layout and lifting together. Tall walls move stud design and bracing, and restricted storage or crane access on your lot moves sequencing.
A foundation that is 20 mm out at a beam pocket does not stay 20 mm out. It moves the beam, the bearing wall above it and the roof reaction after that, until several trades are solving one missed control dimension. We check the foundation and sill control points before the first deck turns that error into the whole house.
Loadbearing studs go in as Stud, Standard or No. 2 grade lumber at 19 percent moisture content or less, so a stud does not shrink and twist behind your drywall. The stud table allows 38 by 89 mm exterior studs at 600 mm on centre for roof-only support up to 3.0 m high. But a wall carrying a floor needs tighter spacing or 38 by 140 mm members, which is why the same-looking wall on two storeys can carry two different specs.
Subfloor thickness runs from roughly 15.5 mm at 400 mm supports up to 19.0 mm at 600 mm supports. Sheathing fasteners land at 150 mm on centre along edges and 300 mm at intermediate supports. So the schedule for your actual span gets used, not a default.
Your municipality publishes the house inspection sequence, and structural framing with HVAC rough-in is generally called before insulation, with plumbing, electrical and HVAC work complete and passed at that stage. The structure has to be weather-tight with fire blocking ready when that inspection is called.
Ontario requires notice once your Part 9 structural framing and the HVAC ductwork and piping are substantially complete. Insulation only follows once framing is approved, so an unresolved structural change holds up the enclosure sequence behind it. Your window, door, stair, mechanical and cabinet trades all inherit the rough openings, floor elevations and backing this frame establishes.
Ontario sets the framing rules and your municipality administers the permit and books the framing inspection. So the same package can move at a different pace in Toronto than in Vaughan or Milton. A wide subdivision lot gets straightforward crane access, while a tight infill lot changes how beams and trusses get staged, which is why we ask about your site before we commit to a sequence.
Send a complete architectural set, structural drawings, beam and post schedules, floor layouts, roof or truss layout, opening schedules and every issued revision, plus your site plan, survey, foundation status, intended occupancy, floor area and storey count. Tell us the engineered-member supplier and the intended roofing material, since both change the structural case. Flag any delivery, road-occupation, storage or lifting constraint on your lot before we commit to a sequence.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, if the issued structural design and foundation conditions support it. We check the house as a continuous load path rather than judging capacity from member size alone.
The reliable schedule begins after control dimensions, engineered-member layouts and lifting access are settled. Promising a framing date before those inputs agree only moves the delay onto your site.
Your window, stair, mechanical and finish trades inherit the elevations and openings we establish, so release happens only after those interfaces are checked.
Timberr owns stopping, documenting and explaining the framing conflict. The engineer or designer approves structural changes, and we build the written answer instead of improvising inside your house.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, the property address, permit status and the start window you are working toward. We will review the framing package, flag any missing bearing, opening or engineering decision, and give you a scope you can actually price against.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides custom home framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.