Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Fourplex framing in Uxbridge and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Uxbridge Township issues its own building permits; Durham Region handles identified septic approvals. Digital permit drawings require zoning compliance and a complete application. Site plans can show driveways, setbacks, wells and septic systems where applicable.
Uxbridge uses a separate road-occupancy path for material or equipment in the road allowance, so the fourplex frame avoids unpermitted road space. A required lot-grading plan shows existing and finished grades, foundation elevation and drainage. Septic, zoning and servicing questions remain address specific.
At the address, we verify unit layouts, bearing lines, openings and separation details. We also confirm the current municipal approval status and the route for lumber, engineered members and site access. That route is checked without assuming municipal road space is available.
The quote separates structural changes, unit layout, separations, openings, services and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
Four units can be arranged one per level, two over two, side by side or in another approved configuration; the unit count does not prove the form. That means your engineer may need to settle the load path before material is ordered.
Residential suites generally require at least a 45 min separation from adjacent rooms and suites under Part 9, subject to the listed exceptions. That means your quote carries the matching member layout, connector schedule and site handling.
A dwelling unit containing two or more storeys, including a basement, generally requires a 1 h separation from the remainder of the Part 9 building, subject to the stated exceptions. That means you get the route supported by the drawings instead of a choice made from habit.
Public corridors generally require at least a 45 min fire separation from the rest of a Part 9 building, subject to exceptions. That means your following trades inherit that system's spacing, openings and limits.
A fourplex wall can be correct as a unit boundary and wrong as a bearing line. Move it to simplify the suite layout and the upper load may land over an unsupported joist field. We resolve the architectural wall and structural support together before the floor system is released.
Loadbearing-stud grade and framing-lumber moisture requirements remain applicable to a Part 9 fourplex, which means your installed member must match the grade or product shown in the design. Stud size and spacing change with wall height and supported floor and roof loads, which means you can verify the material condition before it is enclosed.
Joists require at least 38 mm end bearing unless supported by the permitted ribbon-board condition, which means your bearing and connection detail must preserve that capacity. Beam ends generally require 89 mm of even, level bearing, which means you can trace the fastening requirement to the actual assembly.
Part 9 notice is required when structural framing and heating and air-conditioning ductwork and piping are substantially complete. That means your sequence must reach that visible hold point before finishes. The permit holder requests inspection from the municipality, which means you can plan the following trade around the stated response.
The prescribed response after notice is two days, excluding weekends, holidays and closed-office days. That means your mechanical and electrical work may have to be complete before the framing review. Board, firestopping and mechanical trades inherit four sets of unit-boundary and service-opening conditions, which means you avoid reopening work the municipality needed to see.
Address, zoning confirmation, permit status and approved four-unit layout, which means you give the estimator the current design basis. Unit-boundary, corridor, stair, exit and fire-separation plans, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Uxbridge work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Uxbridge Township administers permits for residential, commercial and industrial additions and structural alterations.
The issued permit package and the work assigned to that inspection stage must be ready. Use the Cloudpermit record and issued drawings for the inspection sequence.
Unresolved access approval or an incomplete material route can delay mobilisation. Permit Central handles road occupancy when materials or equipment use the municipal road allowance. The quote also needs structural changes, unit layout, separations, openings, services and access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Uxbridge. See all framing in Uxbridge →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, property address, permit status and target start. We will check the package around four units, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides fourplex framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.