Duplex Framing in Burlington, Ontario, framed on site by Timberr Framing
Framing in Burlington

Duplex Framing in Burlington

Duplex framing in Burlington and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Burlington framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from duplex framing in Burlington

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm the approved two-unit use, zoning, permit status, building area, height and Part 9, Part 3 or Part 11 path, so you get a buildable set with bearing lines and open questions marked.
  2. Verify. Mark each dwelling-unit boundary, common space, bearing line and vertical service route from coordinated drawings, so you catch a dimensional conflict before it becomes a site delay.
  3. Set. For a conversion, expose and verify the existing joists, beams, walls and support below before structural cuts are released, so your loads land on the supporting structure in the designed order.
  4. Frame. Frame floors, walls, beams, posts and openings while maintaining continuous support beneath bearing walls and concentrated reactions, so your next layout starts from a stable control line.
  5. Coordinate. Build the vertical or horizontal unit boundary to the approved assembly, including framing at service spaces and openings, so you can correct openings, blocking and service zones while access is clear.
  6. Release. Coordinate ducts, pipes, wiring and firestopping conditions before the structure or unit separation is enclosed, so you get visible, documented work ready for inspection and handoff.
Duplex Framing in Burlington being framed on site by Timberr Framing

Ready to price duplex framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why put Timberr on this part of the build

We quote a side-by-side duplex concentrates the dwelling-unit boundary in a vertical from the architectural and structural information, identify missing decisions before mobilising, and keep changes tied to written direction, so you can compare a defined scope and know which revision controls the work.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed work is backed by our workmanship warranty, which means you can verify who stands behind the a side-by-side duplex concentrates the dwelling-unit boundary in a vertical handoff.

Duplex Framing in Burlington by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Duplex Framing in Burlington

Understanding duplex framing

What the crew checks in Burlington

What the crew checks in Burlington

Burlington requires Pre-Building Approval before the building-permit submission for house additions. That approval can coordinate zoning, grading, drainage and tree review. Materials or equipment kept on a City road require a road-occupancy permit.

Burlington requires inspection before construction is covered or carried past the applicable stage, so the duplex frame stays open until its stage clears. Alterations to a designated property can require a heritage permit before the building work proceeds. Pre-Building Approval can still be required where the unit work changes the building, grading, drainage or trees.

What belongs in the Burlington site scope

What belongs in the Burlington site scope

At the address, we verify unit layout, bearing lines, openings and separation details. We also confirm how lumber, engineered members and site access will reach and move through the work area. The quote separates structural changes, unit layout, separations, openings, services and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.

The systems and conditions that change the work

The systems and conditions that change the work

A side-by-side duplex concentrates the dwelling-unit boundary in a vertical wall; a stacked duplex also relies on a horizontal floor-ceiling separation. That means your engineer may need to settle the load path before material is ordered.

Adding a secondary unit to an existing house is not automatically the same design exercise as a purpose-built duplex. Existing-building and secondary-suite provisions can apply, which means your quote carries the matching member layout, connector schedule and site handling.

A dwelling unit containing two or more storeys, including a basement, generally requires a 1 h separation from the rest of a Part 9 residential building, subject to the stated exceptions. That means you get the route supported by the drawings instead of a choice made from habit.

The secondary-suite alternative in OBC 9.10.9.16(4) uses continuous smoke-tight Type X gypsum protection and cannot be applied to an unrelated assembly by analogy. That means your following trades inherit that system's spacing, openings and limits.

Problems worth preventing before they disappear behind finishes

Problems worth preventing before they disappear behind finishes

Failure: treating municipal permission for two units as approval of the construction details. Prevention: obtain the permit and frame the approved Code design, which means you do not inherit that condition after it is concealed. Failure: locating the unit boundary from a marketing plan. Prevention: coordinate the architectural, structural and fire-separation drawings, which means you can correct the load path or assembly while the work remains accessible.

Failure: placing a stacked bearing wall over an unsupported joist field. Prevention: align or design the support path below, which means your approved repair is documented before the next trade arrives. We stop a conflict involving a side-by-side duplex concentrates the dwelling-unit boundary in a vertical because you need the designer's answer before an improvised fix becomes permanent.

Plans, sequencing, and site decisions

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Loadbearing studs use Stud, Standard or No. 2 grade lumber under the Part 9 table, while non-loadbearing studs can use the listed lower grades. That means your installed member must match the grade or product shown in the design. Framing lumber is installed at no more than 19 percent moisture content, which means you can verify the material condition before it is enclosed.

Floor-joist end bearing is at least 38 mm unless the permitted ribbon-board support is used, which means your bearing and connection detail must preserve that capacity. Beam ends require at least 89 mm of even, level bearing unless the applicable span-table note says otherwise. That means you can trace the fastening requirement to the actual assembly.

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario requires notice when Part 9 structural framing and the heating and air-conditioning ductwork and piping are substantially complete. That means your sequence must reach that visible hold point before finishes. The Code prescribes a two-day inspection response after notice, excluding weekends, holidays and closed-office days, which means you can plan the following trade around the stated response.

The local building department identifies and performs the required inspections; the permit holder must request them. That means your mechanical and electrical work may have to be complete before the framing review. Drywall and firestopping trades inherit the unit-boundary framing, supported edges and coordinated penetrations, which means you avoid reopening work the municipality needed to see.

What to send for a useful quote

What to send for a useful quote

Address, approved unit count, zoning confirmation, permit status and new-build or conversion scope, which means you give the estimator the current design basis. Coordinated architectural, structural, fire-separation and mechanical drawings, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Duplex Framing in Burlington, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Duplex Framing FAQ

Does duplex framing need a permit in Burlington?

It depends on whether the scope is permit work. For a house addition, Burlington requires Pre-Building Approval before the building-permit submission.

What must be ready for the local inspection?

The issued permit package and the work for that inspection stage must be ready. Keep the approved drawings and permit card on site. Do not cover work or move beyond the listed stage before inspection.

Can Duplex Framing materials or equipment use public space?

Only when the applicable municipal approval allows it. A road-occupancy permit is required when construction materials or equipment stay on a City road.

What should I send for a duplex framing quote?

Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs structural changes, unit layout, separations, openings, services and access plus the proposed route for lumber, engineered members and site access.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a duplex framing quote in Burlington

Send the current drawings, property address, permit status and target start. We will check the package around a side-by-side duplex concentrates the dwelling-unit boundary in a vertical, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call