Quote-Ready Now Licensed & Insured
Triplex Framing, framed on site by Timberr Framing
Custom Framing

Triplex Framing

Triplex framing across Toronto, the GTA and the Golden Horseshoe, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from triplex framing

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm the approved three-unit use, zoning, permit status, building area, height and existing-building or new-build Code path, so you get a buildable set with bearing lines and open questions marked.
  2. Verify. Overlay unit plans, bearing lines, public corridors, stairs and service risers before floor and wall layout begins, so you catch a dimensional conflict before it becomes a site delay.
  3. Set. Verify support below each stacked bearing wall, beam reaction and concentrated opening load, so your loads land on the supporting structure in the designed order.
  4. Frame. Frame horizontal and vertical suite boundaries to the approved assembly, maintaining continuity through concealed spaces, so your next layout starts from a stable control line.
  5. Coordinate. Frame stairs, landings, door openings and service shafts to the issued geometry before trades route through the structure, so you can correct openings, blocking and service zones while access is clear.
  6. Release. Coordinate penetrations and firestopping details before separation work is enclosed, so you get visible, documented work ready for inspection and handoff.
Triplex Framing being framed on site by Timberr Framing

Ready to price triplex framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why Timberr is different on this scope

We name the real unit arrangement instead of assuming one suite per floor. That lets us coordinate bearing stacks, floor edges, shafts and separation terminations for the layout that was actually approved.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed triplex framing work is backed by our workmanship warranty. The same team that reviews the risk remains accountable through the handoff.

Triplex Framing by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
How It Gets Built

More about triplex framing

Understanding triplex framing

The systems and conditions that change the work

The systems and conditions that change the work

A one-unit-per-storey layout concentrates suite separation in two floor-ceiling planes, while a side-by-side arrangement relies more heavily on vertical separations. That means your engineer may need to settle the load path before material is ordered.

A unit occupying two or more storeys, including a basement, generally requires a 1 h separation from the rest of a Part 9 residential building, subject to the listed exceptions. That means your quote carries the matching member layout, connector schedule and site handling.

Other residential suites generally require at least a 45 min fire separation from adjacent rooms and suites under the Part 9 provision. That means you get the route supported by the drawings instead of a choice made from habit.

Public corridors generally require at least a 45 min fire separation from the rest of a Part 9 building, subject to the stated exceptions. That means your following trades inherit that system's spacing, openings and limits.

What belongs in the scope

What belongs in the scope

The structural frame must align with unit boundaries, common spaces, exits and service zones so required separations remain continuous, so the triplex boundary is fixed before award. Your municipality's zoning permission for multiplexes containing up to four units does not replace the building permit or property-specific Code review. That means your quote can name exclusions and owner-supplied items instead of hiding them.

Unit arrangement determines the length and orientation of suite separations, so measured triplex quantities control the takeoff. Common stairs, corridors and entrances change framed openings and rated wall scope, which means you can compare the selected member schedule rather than a generic allowance. Stacked kitchens and bathrooms increase repeated service openings and coordination points, so triplex coordination is visible before approval.

The mistake we want found before the work begins

The mistake we want found before the work begins

A floor-to-floor separation that stops at an open ceiling chase leaves the units connected through the concealed space. The partitions can look complete from every room while the approved boundary is incomplete above them. We trace each separation to its required termination before services enter the chase.

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Part 9 loadbearing studs use the grades listed for that purpose. Framing lumber is installed at no more than 19 percent moisture content. That means your installed member must match the grade or product shown in the design. Stud size and spacing depend on unsupported height and supported floor and roof loads, which means you can verify the material condition before it is enclosed.

Floor-joist end bearing is at least 38 mm unless the permitted ribbon-board support is used, which means your bearing and connection detail must preserve that capacity. Beam ends generally require at least 89 mm of even, level bearing, which means you can trace the fastening requirement to the actual assembly.

Plans, sequencing, and site decisions

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario's Part 9 notice point combines substantial completion of structural framing with heating and air-conditioning ductwork and piping. That means your sequence must reach that visible hold point before finishes. The permit holder requests municipal inspections, which means you can plan the following trade around the stated response.

The prescribed response after notice is two days, excluding weekends, holidays and closed-office days. That means your mechanical and electrical work may have to be complete before the framing review. Drywall and firestopping trades inherit vertical and horizontal suite-boundary framing, which means you avoid reopening work the municipality needed to see.

Planning the work across the GTA

Planning the work across the GTA

Ontario sets the building rules while the municipality administers the permit and inspection for the address. That means your approved set must settle a one-unit-per-storey layout concentrates suite separation in two floor-ceiling planes, before work is covered. Your site decides the delivery, storage and lifting route for that system. So you get a different sequence for a clear subdivision lot, a tight infill lane or an occupied commercial unit.

What to send for a useful quote

What to send for a useful quote

Address, zoning result, permit status and approved three-unit plans, which means you give the estimator the current design basis. Unit arrangement, common corridors, stairs, entrances and suite-boundary assemblies, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Triplex Framing, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Triplex Framing FAQ

Will triplex framing hold my construction schedule?

It holds the schedule when every unit boundary is identified and coordinated before repetition begins. The word triplex does not tell the crew where those boundaries run.

What usually delays triplex framing after mobilisation?

Incomplete concealed-space terminations and offset bearing walls cause the most disruptive corrections. We check both while the assemblies remain open.

What do the following trades inherit from this work?

Your mechanical and board crews receive explicit unit boundaries, supported upper walls and inspected separation edges.

Who owns a framing conflict found on site?

Timberr owns documenting the conflict, protecting the affected work and getting it to the responsible designer or consultant. We do not hide an unapproved field change inside the handoff.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a triplex framing quote

Send the current drawings, property address, permit status and target start. We will check the package around a one-unit-per-storey layout concentrates suite separation in two floor-ceiling planes,, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call