Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Triplex framing in Richmond Hill and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Richmond Hill requires permits for new houses, additions and material alterations. Permit documents must remain available on the construction site for inspection. A road-occupancy permit applies to work inside the municipal right of way and includes pre-construction photographs.
Richmond Hill requires adjacent roads to remain clear and clean during construction, so the triplex frame stages clear of the travelled road. Zoning and grading checks can remain open even when the structural drawing set is complete. Additional-unit allowances remain subject to site-specific compliance and separate limits for accessory buildings.
At the address, we verify unit layouts, bearing lines, openings and separation details. We also confirm how lumber, engineered members and site access will reach and move through the work area. The quote separates structural changes, unit layout, separations, openings, services and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.
A one-unit-per-storey layout concentrates suite separation in two floor-ceiling planes, while a side-by-side arrangement relies more heavily on vertical separations. That means your engineer may need to settle the load path before material is ordered.
A unit occupying two or more storeys, including a basement, generally requires a 1 h separation from the rest of a Part 9 residential building, subject to the listed exceptions. That means your quote carries the matching member layout, connector schedule and site handling.
Other residential suites generally require at least a 45 min fire separation from adjacent rooms and suites under the Part 9 provision. That means you get the route supported by the drawings instead of a choice made from habit.
Public corridors generally require at least a 45 min fire separation from the rest of a Part 9 building, subject to the stated exceptions. That means your following trades inherit that system's spacing, openings and limits.
Failure: assuming three units means one unit per floor. Prevention: quote the approved layout and name the actual unit boundaries, which means you do not inherit that condition after it is concealed. Failure: ending a vertical separation at an open concealed ceiling space. Prevention: continue or cap the separation as required by the approved assembly, which means you can correct the load path or assembly while the work remains accessible.
Failure: placing an upper bearing wall over unsupported joists. Prevention: align support or obtain designed transfer framing, which means your approved repair is documented before the next trade arrives. We stop a conflict involving a one-unit-per-storey layout concentrates suite separation in two floor-ceiling planes, because you need the designer's answer before an improvised fix becomes permanent.
Part 9 loadbearing studs use the grades listed for that purpose. Framing lumber is installed at no more than 19 percent moisture content. That means your installed member must match the grade or product shown in the design. Stud size and spacing depend on unsupported height and supported floor and roof loads, which means you can verify the material condition before it is enclosed.
Floor-joist end bearing is at least 38 mm unless the permitted ribbon-board support is used, which means your bearing and connection detail must preserve that capacity. Beam ends generally require at least 89 mm of even, level bearing, which means you can trace the fastening requirement to the actual assembly.
Ontario's Part 9 notice point combines substantial completion of structural framing with heating and air-conditioning ductwork and piping. That means your sequence must reach that visible hold point before finishes. The permit holder requests municipal inspections, which means you can plan the following trade around the stated response.
The prescribed response after notice is two days, excluding weekends, holidays and closed-office days. That means your mechanical and electrical work may have to be complete before the framing review. Drywall and firestopping trades inherit vertical and horizontal suite-boundary framing, which means you avoid reopening work the municipality needed to see.
Address, zoning result, permit status and approved three-unit plans, which means you give the estimator the current design basis. Unit arrangement, common corridors, stairs, entrances and suite-boundary assemblies, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
It depends on whether the scope is permit work. New houses, additions and material alterations require a Richmond Hill building permit.
The issued permit package and the work for that inspection stage must be ready. Keep the permit documents on site and present the work at the mandatory stages listed for the project.
Only when the applicable municipal approval allows it. Use a road-occupancy permit when work enters the municipal right of way, and keep adjacent roads clear of debris and storage.
Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs structural changes, unit layout, separations, openings, services and access plus the proposed route for lumber, engineered members and site access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Richmond Hill. See all framing in Richmond Hill →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, property address, permit status and target start. We will check the package around a one-unit-per-storey layout concentrates suite separation in two floor-ceiling planes,, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides triplex framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.