Quote-Ready Now Licensed & Insured
Subfloor and Sheathing, framed on site by Timberr Framing
Custom Framing

Subfloor and Sheathing

Subfloor and sheathing across Toronto, the GTA and the Golden Horseshoe, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from subfloor and sheathing

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm panel type, grade or span rating, thickness, support spacing, edge-support requirement, face orientation, fastening and adhesive requirements from the structural and architectural documents, so you get a buildable set with bearing lines and open questions marked.
  2. Verify. Check joist, rafter, truss and wall layout for support at panel ends, openings and required blocked edges before sheets are placed, so you catch a dimensional conflict before it becomes a site delay.
  3. Set. Protect panels from avoidable wetting and reject material whose damage prevents it from performing as specified, so your loads land on the supporting structure in the designed order.
  4. Frame. Install plywood and oriented panels with their required face direction perpendicular to the framing, staggering the specified joints, so your next layout starts from a stable control line.
  5. Coordinate. Maintain the required panel gaps rather than forcing sheets tight as the deck progresses, so you can correct openings, blocking and service zones while access is clear.
  6. Release. Complete edge blocking, clips, tongue-and-groove engagement and fastening before the panel field becomes concealed by flooring, roofing or cladding layers, so you get visible, documented work ready for inspection and handoff.
Subfloor and Sheathing being framed on site by Timberr Framing

Ready to price subfloor and sheathing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why Timberr is different on this scope

We read the panel mark against the support spacing instead of accepting nominal thickness as proof. Orientation, edge support, gaps and fastening are checked by assembly before the deck or wall is released.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed subfloor and sheathing work is backed by our workmanship warranty. The same team that reviews the risk remains accountable through the handoff.

Subfloor and Sheathing by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
How It Gets Built

More about subfloor and sheathing

Understanding subfloor and sheathing

The systems and conditions that change the work

The systems and conditions that change the work

Plywood, OSB, waferboard, lumber and certain other boards appear in different Code provisions, with material standards and minimum properties tied to their use. That means your engineer may need to settle the load path before material is ordered.

Particleboard subflooring is permitted only where factory construction prevents weather exposure. Its upper face and edges need water-absorption treatment in periodically wet rooms. That means your quote carries the matching member layout, connector schedule and site handling.

Tongue-and-groove panel edges can provide required subfloor edge support; otherwise the Code calls for blocking at least 38 mm by 38 mm where edge support is required. That means you get the route supported by the drawings instead of a choice made from habit.

Roof-sheathing edge support can use metal H clips or blocking at least 38 mm by 38 mm, while tongue-and-groove edges can remove that support requirement under the stated provision. That means your following trades inherit that system's spacing, openings and limits.

What belongs in the scope

What belongs in the scope

Subflooring is required beneath a finish floor where the finish does not have adequate strength to carry the design loads, so the subfloor-sheathing boundary is fixed before award. Structural sheathing work within new construction, additions and material structural alterations is part of the permitted framing scope where a building permit is required. That means your quote can name exclusions and owner-supplied items instead of hiding them.

Floor, roof and wall area set base panel quantity, while openings, hips, valleys, setbacks and irregular edges increase cuts and waste, so measured subfloor-sheathing quantities control the takeoff. Support spacing and required panel rating or thickness change material selection, which means you can compare the selected member schedule rather than a generic allowance. Required blocking, H clips, tongue-and-groove edges and braced-wall nailing change labour and connector quantities, so subfloor-sheathing coordination is visible before approval.

The mistake we want found before the work begins

The mistake we want found before the work begins

Two panels butted tight can look cleaner on framing day and buckle after they take on moisture. The required edge gap is small, but the repair is not once walls or roofing sit over the sheets. We maintain the specified spacing while every joint is still visible.

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Wood-based subfloor panels must conform to one of the plywood, construction-sheathing, OSB or waferboard standards listed in OBC 9.23.15.2. That means your installed member must match the grade or product shown in the design. Plywood subflooring is installed with surface grain perpendicular to the joists, and joints parallel to joists are staggered. That means you can verify the material condition before it is enclosed.

The corresponding face orientation for qualifying OSB and waferboard subflooring is also perpendicular to joists, with parallel joints staggered. That means your bearing and connection detail must preserve that capacity. At 400 mm support spacing, Table 9.23.15.5-A lists a minimum 15.5 mm thickness for plywood and O-2 grade OSB, subject to the table's material and floor-system conditions. That means you can trace the fastening requirement to the actual assembly.

Plans, sequencing, and site decisions

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario names structural framing as a construction stage for which the permit holder contacts the municipality for inspection. That means your sequence must reach that visible hold point before finishes. Your municipality's approved drawings typically distinguish existing and proposed construction on addition work. So replacement sheathing and new structural panels should remain traceable to the permitted scope. That means you can plan the following trade around the stated response.

Flooring installers inherit panel thickness, joint support, fastening, moisture condition and surface flatness from the subfloor. That means your mechanical and electrical work may have to be complete before the framing review. Roofers inherit panel rating, support, edge condition, spacing and damaged areas from the roof deck, which means you avoid reopening work the municipality needed to see.

Planning the work across the GTA

Planning the work across the GTA

Ontario sets the building rules while the municipality administers the permit and inspection for the address. That means your approved set must settle plywood, osb, waferboard, lumber and certain other boards appear before work is covered. Your site decides the delivery, storage and lifting route for that system. So you get a different sequence for a clear subdivision lot, a tight infill lane or an occupied commercial unit.

What to send for a useful quote

What to send for a useful quote

Floor, roof and wall framing plans with support spacing and all current revisions, which means you give the estimator the current design basis. Panel material, grade or span rating, thickness and face-orientation requirements, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Subfloor and Sheathing, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Subfloor and Sheathing FAQ

Will subfloor and sheathing hold my construction schedule?

It protects the schedule when panel grade, span rating and orientation are confirmed before installation. A correct thickness with the wrong mark is still the wrong panel.

What usually delays subfloor and sheathing after mobilisation?

Tight joints and unsupported or misoriented edges create failures that appear after concealment. We check them during placement.

What do the following trades inherit from this work?

The next crew receives a flat, supported surface with joints and fastening completed for the specified assembly.

Who owns a framing conflict found on site?

Timberr owns documenting the conflict, protecting the affected work and getting it to the responsible designer or consultant. We do not hide an unapproved field change inside the handoff.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a subfloor and sheathing quote

Send the current drawings, property address, permit status and target start. We will check the package around plywood, osb, waferboard, lumber and certain other boards appear, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call