Quote-Ready Now Licensed & Insured
Multiplex Framing in Scarborough, Ontario, framed on site by Timberr Framing
Framing in Scarborough

Multiplex Framing in Scarborough

Multiplex framing in Scarborough and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Scarborough framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from multiplex framing in Scarborough

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the work moves from drawings to handoff

  1. Review. Confirm the permitted unit count, occupancy, Part 9 or Part 3 path and structural drawings before layout, so you start with bearing lines already flagged.
  2. Mark. Mark unit boundaries, bearing lines and service routes from the coordinated plans, so a conflict surfaces before a wall goes up wrong.
  3. Carry the structure. Frame beams, joists and floor openings while keeping support beneath every bearing wall, so each floor lands where the drawings designed it to.
  4. Set the units. Frame dwelling-unit stud walls without substituting an ordinary partition for a required fire-separation assembly, so the wall your drywaller boards next month is what the inspector expects.
  5. Coordinate and hold. Install blocking and framed service spaces, coordinate the mechanical penetrations, then keep separation details visible until the prescribed OBC inspections are complete.
  6. Release. Document approved revisions to studs or sheathing for the finish trades before handoff, so the next crew works from the same set we did.
Multiplex Framing in Scarborough being framed on site by Timberr Framing

Ready to price multiplex framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why put Timberr on this part of the build

We check a duplex, triplex or fourplex against the coordinated architectural, structural and fire-separation drawings before we quote, flag a missing bearing condition or an unresolved Part 9 versus Part 3 question before the crew mobilizes, and tie every change to a written revision, so you always know which set is actually being built.

Timberr is licensed, insured and WSIB-covered, we hold a 5.0 rating across 39 Google reviews, and the finished work is backed by our workmanship warranty, so you can verify who stands behind the frame before you sign anything. Your drywaller and firestopping trades inherit the stud separation lines we leave behind. If those lines are wrong, you pay for it twice.

Multiplex Framing in Scarborough by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Multiplex Framing in Scarborough

Understanding multiplex framing

What the crew checks in Scarborough

What the crew checks in Scarborough

Scarborough uses the City of Toronto permit, inspection and zoning system; there is no separate Scarborough building department. The former Scarborough zoning system contains 34 community by-laws plus an employment-district by-law. Materials, equipment or a disposal container placed in the public right of way use Toronto's street-occupation process.

The district road index excludes public and private lanes, so the multiplex frame uses a curb-measured delivery route. A former Scarborough performance standard or site-specific exception can override a general provision. Toronto's citywide multiplex permissions apply in Scarborough, but the address still needs permit and zoning review.

What belongs in the Scarborough site scope

What belongs in the Scarborough site scope

At the address, we verify unit layouts, bearing lines, openings and separation details. We also confirm how lumber, engineered members and constrained-site deliveries will reach and move through the work area. The quote separates unit count, structural changes, separations, openings, services and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.

The real variants and conditions that change the work

The real variants and conditions that change the work

A duplex, triplex or fourplex is selected by unit count and zoning. But unit count alone does not decide OBC Part 9 versus the applicable Parts 3 to 6 design path. So your engineer may need to settle the load path before material is ordered. Toronto permits up to four units in specified low-rise zones; Mississauga runs a separate framework, but neither changes the Part 9 size test.

Side-by-side units concentrate separation work in vertical walls under OBC 9.10.9.16, while stacked units add horizontal floor-ceiling separations on top. So a stacked layout carries more framed assembly at the same unit count. A unit with two or more storeys, including a basement, generally needs a 1 h separation from the rest of a Part 9 building. So your two-storey unit inherits a heavier separation than the unit beside it.

A secondary-suite conversion has its own OBC alternative using continuous, smoke-tight Type X gypsum protection that cannot be copied onto a purpose-built multiplex. So a converted basement apartment and a new-build fourplex get framed and priced differently at the same unit count. Converting a house also adds OBC Part 11 coordination new construction skips.

Conventional dimensional lumber, I-joists, metal-web wood joists and plated wood trusses are all possible structural categories. But an engineered system locks you into that supplier's layout and connectors once ordered. So switching systems mid-project means new drawings, not a field substitution.

Problems worth preventing before they disappear behind finishes

Problems worth preventing before they disappear behind finishes

A unit boundary framed from an uncoordinated plan can misalign the required separation. So we work from the approved architectural and fire-separation layouts together instead of eyeballing a stud wall location off one drawing. Unplanned ducts or pipes can break separation continuity after the wall is closed. So we coordinate every penetration against OBC 9.10.9.6 and the approved firestopping detail before framing gets ahead of the mechanical trades.

A stacked bearing wall without support below it interrupts the load path straight to the foundation. So we align every bearing wall over a wall, beam or designed floor system, not a convenient joist bay. Field cuts to an I-joist or truss can void the manufacturer's design, so we use the approved layout and repair detail instead of a site improvisation. Concealing a separation before inspection can force destructive reopening of studs and sheathing, and that costs you the schedule twice.

Plans, sequencing, and site decisions

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Loadbearing studs go in as Stud, Standard or No.2 grade lumber. Non-loadbearing studs can use Stud, Utility or No.3, so the grade stamp actually matches what that wall carries. Framing lumber has to arrive at 19 percent moisture content or less, because wet lumber shrinks and twists once enclosed behind drywall.

Stud size and spacing depend on unsupported height and the floors and roof loads a wall supports. Studs run continuous through a full storey with no site splicing. So a stacked unit gets a heavier stud schedule than the single-storey unit beside it. Beam ends need at least 89 mm of even, level bearing. A joist framed into a beam needs a hanger, connector or compliant ledger. So the load transfers as the design intends.

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario requires notice once your Part 9 structural framing and HVAC ductwork are substantially complete, while a multiplex outside Part 9 hits its notice point at substantial completion of structural framing and HVAC rough-in instead. Ontario prescribes an inspection response within 2 days of that notice, excluding weekends, holidays and closed-office days. So a package ready on a Thursday should not sit waiting long.

Fire-separation work can carry its own OBC inspection stage, separate from structural framing, so we confirm the local schedule before covering any assembly. Your drywaller and firestopping trades inherit the stud separation lines we leave behind, so what we hand off is what they build from.

What to send for a useful multiplex framing quote

What to send for a useful multiplex framing quote

Send the address, approved unit count, occupancy, zoning confirmation and permit status, plus the coordinated architectural, structural, fire-separation and mechanical drawings, beam and post schedules, with every revision. Include floor and roof layouts, truss drawings and any engineered-member details, and tell us who supplies fire blocking, firestopping backing and separation-board installation. For a conversion, add measured existing conditions and the OBC Part 11 design analysis, so nothing gets assumed.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Multiplex Framing in Scarborough, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Multiplex Framing FAQ

Does multiplex framing need a permit in Scarborough?

It depends on whether the scope is permit work. City of Toronto rules control. Permit-required work in Scarborough follows Toronto Building, not a district permit office.

What must be ready for the local inspection?

The issued permit package and the work for that inspection stage must be ready. Use the Toronto-approved drawings and Toronto inspection sequence; Scarborough does not have a separate inspection path.

Can Multiplex Framing materials or equipment use public space?

Only when the applicable municipal approval allows it. Toronto street-occupation rules apply if materials or equipment enter a Scarborough road, sidewalk, boulevard or public lane.

What should I send for a multiplex framing quote?

Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs unit count, structural changes, separations, openings, services and access plus the proposed route for lumber, engineered members and constrained-site deliveries.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a multiplex framing quote in Scarborough

Send the current drawings, the property address, permit status and the start window you are working toward. We will check the package around your duplex, triplex or fourplex, flag any missing beam, post or fire-separation decision, and give you a scope you can actually price against.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call