Roof and Truss Framing in Newmarket, Ontario, framed on site by Timberr Framing
Framing in Newmarket

Roof and Truss Framing in Newmarket

Roof and truss framing in Newmarket and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.

Get your Newmarket framing quote

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674
5.0 on Google
Workmanship warranty, we stand behind our work Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Custom-framed to your plans Serving the GTA & surrounding area
What You Get

What to expect from roof and truss framing in Newmarket

Built to plan

Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.

Built to last

Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How our roof and truss framing process works

  1. Request the quote. Send Timberr the current architectural and structural set, the address, the intended start window, and photos of retained construction. Call (416) 236-6674 when the drawings need explanation before upload.
  2. Review drawings and site. The review checks the truss package, bearing walls, girder locations, heel heights, valleys, dormers, overbuilds, openings, and set-day access. Timberr confirms scope, exclusions, access, temporary works, the lumber package, and interfaces with wall framing.
  3. Issue a detailed price and schedule. The quote identifies trusses or rafters, girders, loose infill, bracing, connectors, sheathing, equipment, and staged roof materials. Assumptions, material responsibilities, equipment, readiness conditions, and the proposed crew window are written rather than left for site interpretation.
  4. Coordinate the build. One Timberr contact aligns the truss supplier, crane or telehandler, GC, engineer, plumbing and mechanical openings, roofing, and inspections. The sequence accounts for delivery dates, preceding work, other trades, engineer reviews, and inspection hold points.
  5. Execute the framing. The accountable crew completes bearing preparation, truss or rafter setting, girders, valleys, hips, overbuilds, permanent bracing, openings, and sheathing. It checks layout and temporary stability while the adjoining subfloor and sheathing interface remains buildable.
  6. Prepare for inspection. Timberr checks truss placement, bearing, connector schedules, permanent bracing, field repairs, framed openings, and roof sheathing before the stage is presented under the Ontario Building Code. Approved drawings and engineered details remain available, and work that must be seen is not covered early.
  7. Hand over cleanly. The closeout provides straight eaves and ridges, documented truss repairs, protected openings, a swept deck, and roof planes ready. Timberr removes offcuts, resolves in-scope deficiencies, and gives the GC or owner a clear area for the next scheduled trade.
Roof and Truss Framing in Newmarket being framed on site by Timberr Framing

Ready to price roof and truss framing?

Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.

Call (416) 236-6674
Why Us

Why Timberr is different on this scope

We coordinate the roof plan, truss package, girder reactions and wall posts before erection. The crew arrives with a lift sequence tied to the actual layout, and every nonconforming member is documented back to the supplier.

Timberr is licensed, insured and WSIB-covered, carries a 5.0 rating across 39 Google reviews, and the completed roof and truss framing work is backed by our workmanship warranty. The same team that reviews the risk remains accountable through the handoff.

Roof and Truss Framing in Newmarket by Timberr Framing
B Brookevia Google
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
T Trudyvia Google
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
W Williamvia Google
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
S Sokratisvia Google
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
E Ericavia Google
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
C Cesarvia Google
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Local Context

Roof and Truss Framing in Newmarket

Understanding roof and truss framing

What changes the site plan in Newmarket

What changes the site plan in Newmarket

Newmarket requires permits for most renovation, alteration, construction and demolition work. The issued permit must remain posted on site. Cranes, scaffolding, hoarding, equipment trailers or temporary boulevard crossings can require road-occupancy approval.

Newmarket directs permit holders to arrange inspection before covering work, so the roof frame stays visible at permit-card stage. The zoning examiner checks setbacks, height and lot coverage for additions and new structures.

What belongs in the Newmarket site scope

What belongs in the Newmarket site scope

At the address, we verify bearing points, truss layout, openings and roof geometry. We also confirm the current municipal approval status and the route for trusses, roof lumber, panels and crane access. That route is checked without assuming municipal road space is available.

The quote separates roof area, geometry, truss or rafter system, openings, loads and lifting, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.

The systems and conditions that change the work

The systems and conditions that change the work

Site-framed rafters use OBC span tables selected by species, grade, spacing, roof load and support conditions. That means your engineer may need to settle the load path before material is ordered.

Prefabricated roof trusses use an engineered design and layout, and field holes or notches are prohibited unless that design permits them. That means your quote carries the matching member layout, connector schedule and site handling.

Girder trusses create concentrated reactions that require stud posts sized from the Code tables or structural design. That means you get the route supported by the drawings instead of a choice made from habit.

Hip and valley roofs require members and support under 9.23.14 rather than being treated as repeated common rafters. That means your following trades inherit that system's spacing, openings and limits.

The mistake we want found before the work begins

The mistake we want found before the work begins

A truss that misses its bearing cannot be made to fit with a saw. One field cut takes the member outside its approved design and turns a delivery problem into an engineering repair while the crane and crew wait. We stop the lift and obtain the truss designer's answer instead of modifying the member on site.

Plans, sequencing, and site decisions

Member and fastening decisions that affect the result

Member and fastening decisions that affect the result

Structural lumber for rafters, roof joists and beams must carry an accepted grade mark. That means your installed member must match the grade or product shown in the design. Installed framing lumber must contain no more than 19 percent moisture, which means you can verify the material condition before it is enclosed.

Roof spans depend on species, grade, depth, spacing and snow-load table rather than one province-wide rafter span, which means your bearing and connection detail must preserve that capacity. Rafters and roof joists require end bearing under the applicable OBC support provisions, which means you can trace the fastening requirement to the actual assembly.

The hold point and the trades waiting after it

The hold point and the trades waiting after it

Ontario's Part 9 notice point includes substantially complete structural framing and HVAC rough-ins, which means your sequence must reach that visible hold point before finishes. Ontario prescribes an inspection response within 2 days after notice, excluding weekends, holidays and office closures, which means you can plan the following trade around the stated response.

Vaughan requires the structure to be weather-tight for its structural framing inspection, which means your mechanical and electrical work may have to be complete before the framing review. Roofing inherits panel spacing, edge support and roof geometry, while mechanical trades inherit only approved roof openings, which means you avoid reopening work the municipality needed to see.

What to send for a useful quote

What to send for a useful quote

Request roof plans, slopes, sections, bearing lines, opening details and all revisions, which means you give the estimator the current design basis. Request the truss layout, individual truss designs, girder reactions, bracing and connector details, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.

Comparing framing quotes?

Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.

Call (416) 236-6674
Completed Roof and Truss Framing in Newmarket, framed on site by Timberr Framing
Finished On Site

Framed on site and built to last

Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.

  • Coordinated with the surrounding build
  • Code-minded framing for real-world use
  • Quote-ready support from plans to inspection
FAQ

Roof and Truss Framing FAQ

Will Timberr take on roof and truss framing in Newmarket?

Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Newmarket work from its GTA and York Region service base, with mobilisation tied to the booked address.

Does this work need a building permit from Newmarket?

It depends on whether the proposed scope is permit work. Most renovation, alteration, construction and demolition work requires a Newmarket building permit before starting.

What must be ready for the municipal inspection?

The issued permit package and the work assigned to that inspection stage must be ready. Post the permit, keep the issued drawings on site and arrange every inspection before covering the listed work.

What can delay the crew start in Newmarket?

Unresolved access approval or an incomplete material route can delay mobilisation. Road-occupancy approval can apply to cranes, scaffolding, hoarding, heavy equipment trailers or a temporary boulevard crossing. The quote also needs roof area, geometry, truss or rafter system, openings, loads and lifting.

Not sure the drawings are ready?

Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.

Call (416) 236-6674
Our Work

See real projects across Toronto & Ontario

Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.

View Our Projects

Request a roof and truss framing quote in Newmarket

Under the Newmarket roof and truss plan, send the drawings, address, timing, and known site conditions. On this roof and truss project in Newmarket, Timberr will identify what the scope needs for a reliable quote and framing schedule.

(416) 236-6674

Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered

Send your project details

Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.

Free, no-obligation quote & site visit.

or
Call (416) 236-6674

Companies We've Worked With

Trusted by Leading Organizations

Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.

Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Call