Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Restaurant framing across Toronto, the GTA and the Golden Horseshoe, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Each of these carries different exhaust, plumbing and wall requirements. So the wall package for a hood-heavy line kitchen is not the package we frame for a coffee counter with no cooking exhaust at all. Get that wrong at layout and your mechanical contractor is chasing wall-depth changes after the studs are already covered.
Sitting inside a mixed-use building can require separation from the residential or other occupancies above or beside it under OBC 3.1.3 and 3.2.2.6. So your framing package has to carry that separation, not just a partition wall. That decision belongs on the drawings before we cut a single plate.
These can call for independent support or reinforced openings rather than ordinary partition framing, so your quote should name which openings get that treatment. We frame to the approved structural support for that equipment, never to a guess made on site.
These add architectural geometry on top of the same life-safety requirements, they do not replace them. So a striking feature ceiling still has to clear the same fire separations and egress routes as a plain one.
Occupancy classification and occupant load get established from your actual dining, kitchen, takeout, retail and accessory uses under OBC 3.1.2 and 3.1.17, never from the business name on the lease. So your scope starts from the use that is actually going in. Some municipalities include qualifying small restaurant interior alterations in an express-permit path. But that is not a blanket exemption from permit or Code review. So we still confirm what your specific alteration needs before framing starts.
Wall length, ceiling changes, service openings and washroom count set the framing quantity on your takeoff. Hood, duct, walk-in cooler and equipment supports add structural and service coordination on top of that. Rated separations and shaft construction add extra layers and hold points wherever your plans call for them. Dense plumbing and mechanical routing pushes more bulkheads and framing adjustments into the ceiling. If you are building beside occupied neighbours, restricted delivery windows become a phasing constraint we plan around, not an afterthought.
An exhaust hood cannot be hung from ordinary partition framing because the studs were never designed for that reaction. Discover it after the ceiling and services are underway and the structural support has to be inserted through finished coordination. We establish the approved hood support before surrounding walls close.
Part 9's steel-stud provisions apply only to non-loadbearing walls under OBC 9.24.1.1, so a wall carrying real load moves onto its own design path, not a thicker stud. Interior non-loadbearing steel studs need at least 0.46 mm base-steel thickness under OBC 9.24.2.2. The runners have to be at least as thick as the studs with flanges at least 30 mm deep under OBC 9.24.2.3. So your wall actually holds up under daily kitchen and dining traffic.
Any opening wider than one stud space gets double studs at each jamb under OBC 9.24.2.4. Board fasteners have to penetrate at least 10 mm through the steel framing under OBC 9.24.3.5. So your finish trades find solid backing instead of a stud that spins under the screw.
Your municipality's alteration plans ask for your existing and proposed uses, plumbing fixtures, reflected ceilings, wall assemblies, fire separations and framing above. So that is the package we build toward. You, as the permit holder, are responsible for requesting the required inspections, so we keep rated assemblies and above-ceiling service interfaces visible until that inspection happens.
Your kitchen-equipment and ventilation trades inherit the framed openings, clearances and support points we leave behind. Your plumbing trade inherits the wall depths, fixture centres and service routes we frame around. Sprinkler and fire-alarm trades inherit the ceiling and bulkhead geometry. Your millwork, tile and washable-finish trades inherit the backing, planes and substrate transitions. So the sequence only works if what we hand off is correct the first time.
Ontario sets the Code requirements your restaurant has to meet, occupancy classification, egress, fire separations and equipment support. Your municipality administers the permit and inspection for that address.
Some municipalities include qualifying small restaurant interior alterations in an express-permit scope. But a change of use into restaurant occupancy still needs the applicable Part 10 or Part 11 Code analysis. So an express path is not a shortcut around that review. Your site decides the rest: an occupied plaza with restricted delivery windows frames differently than a standalone building with clear access.
Send your existing and proposed architectural plans with the occupancy analysis, plus seat count, occupant load, exits and barrier-free routes. Add your kitchen-equipment, hood, exhaust, plumbing and electrical plans, along with the wall, ceiling, shaft and fire-separation schedules, and the millwork, banquette, bar and equipment backing elevations. Tell us your access, phasing and closeout responsibilities, so nothing about who requests which inspection gets assumed.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
It protects the opening date when equipment, services, egress and rated boundaries are coordinated before layout. We do not let an unapproved vendor sketch control structural framing.
Late hood support and unprotected rated penetrations create the deepest resequencing. We resolve both before ceilings and walls close.
Your kitchen, mechanical and finish vendors receive approved support, clear routes and backing where their installations actually land.
Timberr owns documenting the conflict, protecting the affected work and getting it to the responsible designer or consultant. We do not hide an unapproved field change inside the handoff.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send your current drawings, the property address, permit status and target start window. We will check the package against your kitchen-equipment, hood and fire-separation drawings, flag any missing structural support or occupancy decision, and give you a scope you can actually price against.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides restaurant framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.