Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Residential development framing in Scarborough and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
I recommend to anyone with a development project or stacked townhome development!
The team at Timberr Framing made the whole framing process so smooth. From great workmanship to clear communication, they are our first choice for any future commercial development projects.
Scarborough uses the City of Toronto permit, inspection and zoning system; there is no separate Scarborough building department. The former Scarborough zoning system contains 34 community by-laws plus an employment-district by-law. Materials, equipment or a disposal container placed in the public right of way use Toronto's street-occupation process.
The district road index excludes public and private lanes, so the development frame uses a curb-measured delivery route. An addition or infill layout needs the applicable community by-law, Schedule A map and Schedule C exceptions checked for the address.
At the address, we verify building grids, repeated details, openings and revision control. We also confirm how sequenced lumber packages, trusses and lifting access will reach and move through the work area. The quote separates building and unit count, repetition, phasing, revisions, logistics and access. Any unresolved drawing, access or inspection condition is named instead of being priced as if it were settled.
A detached-house subdivision, townhouse block and multi-unit low-rise building create different framing repetition and fire-separation conditions. That means your engineer may need to settle the load path before material is ordered.
Part 9 applies only to buildings within its area, height and occupancy limits; a development can contain both Part 9 and Part 3 buildings. That means your quote carries the matching member layout, connector schedule and site handling.
Mississauga states that developments with more than ten residential units are subject to site-plan control. But that is a Mississauga process and not an Ontario-wide threshold for all municipalities. That means you get the route supported by the drawings instead of a choice made from habit.
Vaughan development engineering reviews municipal infrastructure and residential drainage and performs subdivision-related inspections, which means your following trades inherit that system's spacing, openings and limits.
Failure: treating subdivision approval as a building permit. Prevention: track both approval streams separately, which means you do not inherit that condition after it is concealed. Failure: applying one Code path across unlike building types. Prevention: record classification by building, which means you can correct the load path or assembly while the work remains accessible.
Failure: losing revision control across phases. Prevention: bind each material and framing release to a building and drawing revision, which means your approved repair is documented before the next trade arrives. We stop a conflict involving a detached-house subdivision, townhouse block and multi-unit low-rise building because you need the designer's answer before an improvised fix becomes permanent.
Part 9 loadbearing studs use the applicable grade table and framing lumber is installed at no more than 19 percent moisture content. That means your installed member must match the grade or product shown in the design. Stud size and spacing depend on unsupported height and supported floor and roof loads, which means you can verify the material condition before it is enclosed.
Joists require at least 38 mm of end bearing unless the permitted ribbon-board support is used, which means your bearing and connection detail must preserve that capacity. Beam ends generally require at least 89 mm even, level bearing, which means you can trace the fastening requirement to the actual assembly.
Ontario identifies structural framing as a prescribed inspection stage and places booking responsibility on the permit holder. That means your sequence must reach that visible hold point before finishes. Division C distinguishes the framing notice for Part 9 buildings from other buildings, which means you can plan the following trade around the stated response.
Municipal development and lot-grading inspection can proceed separately from building inspection, which means your mechanical and electrical work may have to be complete before the framing review. Mechanical and enclosure trades inherit each building's framed openings, service zones and separation boundaries, which means you avoid reopening work the municipality needed to see.
Development approvals, block and lot schedule, phasing and permit status by building, which means you give the estimator the current design basis. Code analysis and construction type for every building type, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
It depends on whether the scope is permit work. City of Toronto rules control. Permit-required work in Scarborough follows Toronto Building, not a district permit office.
The issued permit package and the work for that inspection stage must be ready. Use the Toronto-approved drawings and Toronto inspection sequence; Scarborough does not have a separate inspection path.
Only when the applicable municipal approval allows it. Toronto street-occupation rules apply if materials or equipment enter a Scarborough road, sidewalk, boulevard or public lane.
Send the address, current architectural and structural drawings, permit status and clear site photos. For this scope, the quote also needs building and unit count, repetition, phasing, revisions, logistics and access plus the proposed route for sequenced lumber packages, trusses and lifting access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Scarborough. See all framing in Scarborough →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, property address, permit status and target start. We will check the package around a detached-house subdivision, townhouse block and multi-unit low-rise building, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides residential development framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.