Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Renovation framing in Stouffville and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Whitchurch-Stouffville administers the building permit and inspections; York Region is not the building authority. The Town reviews electronic submissions for completeness. Conservation, highway-corridor, site-plan or private-servicing approvals can apply by address.
Stouffville requires the permit holder to book the inspections listed on the permit, so the renovation frame follows its permit inspection list. The residential application includes an Applicable Law Checklist before issuance.
At the address, we verify existing bearing, openings, elevations and concealed conditions. We also confirm the current municipal approval status and the route for lumber, engineered members and occupied-site access. That route is checked without assuming municipal road space is available.
The quote separates demolition limits, openings, temporary support, hidden conditions, revisions and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
Basic renovation can retain or reuse similar components where the work does not adversely affect warning systems, fire separations, structural adequacy or health conditions. That means your engineer may need to settle the load path before material is ordered.
Extensive renovation occurs where existing walls, ceilings, floors or roofs are substantially removed and replaced, triggering structural and fire-resistance compliance with the other Parts. That means your quote carries the matching member layout, connector schedule and site handling.
A material alteration or repair must leave the building system's performance at least equal to its performance before the work. That means you get the route supported by the drawings instead of a choice made from habit.
A change of use or increased loading can reduce the building's performance level and require compensating construction. That means your following trades inherit that system's spacing, openings and limits.
A wall that looks non-loadbearing can still catch joist ends, a roof reaction or a previous alteration hidden above it. Remove it on appearance and the movement starts before the beam solution is ready. We expose the bearing condition and match it to the structural design before demolition crosses that line.
Existing acceptable construction does not make new lumber or structural work exempt from the applicable current requirements. That means your installed member must match the grade or product shown in the design. Loadbearing replacement studs require Stud, Standard or No. 2 lumber, which means you can verify the material condition before it is enclosed.
Installed new framing lumber must contain no more than 19 percent moisture, which means your bearing and connection detail must preserve that capacity. Beam ends require at least 89 mm of even, level bearing unless an applicable table note or design provides otherwise. That means you can trace the fastening requirement to the actual assembly.
Ontario's prescribed Part 9 notice point includes substantially complete structural framing and HVAC rough-ins, which means your sequence must reach that visible hold point before finishes. Ontario prescribes an inspection response within 2 days after notice, excluding weekends, holidays and office closures, which means you can plan the following trade around the stated response.
Mississauga checks altered structure and openings against approved drawings while framing remains uncovered. That means your mechanical and electrical work may have to be complete before the framing review. Engineering review may be required when exposed conditions differ from the design. So following trades cannot safely proceed on an undocumented field change. That means you avoid reopening work the municipality needed to see.
Request approved existing and proposed drawings, permit status and Part 11 analysis, which means you give the estimator the current design basis. Request photographs, measurements and known alteration history for the affected framing, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Stouffville work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Whitchurch-Stouffville administers the permit and requires it before covered construction, demolition or renovation begins.
The issued permit package and the work assigned to that inspection stage must be ready. The permit holder books the inspections listed on the issued permit, with the Town requesting at least two business days notice.
Unresolved access approval or an incomplete material route can delay mobilisation. Confirm conservation, highway, site-plan and private-servicing releases before fixing the site schedule. The quote also needs demolition limits, openings, temporary support, hidden conditions, revisions and access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Stouffville. See all framing in Stouffville →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, property address, permit status and target start. We will check the package around basic renovation, so you can resolve a missing structural, access or coordination decision before it becomes a site delay.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides renovation framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.