Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Office framing in Barrie and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
We worked with Timberr Framing for an office project, and they were fantastic. The team was organized, stayed on schedule, and delivered excellent results.
We needed metal stud framing for our office, and Timberr Framing delivered. Their team was professional, skilled, and got the job done quickly without sacrificing quality.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Barrie issues and inspects its own building permits. Structural modifications, alterations and additions require a building permit. Residential construction must be checked against local setbacks, lot coverage and permitted land use.
Barrie requires a building permit for structural modifications, alterations and additions, so the office partition package waits for building approval.
At the address, we verify wall lines, openings, head details, backing and service zones. We also confirm the current municipal approval status and the route for steel studs, track and occupied-floor access. That route is checked without assuming municipal road space is available.
The quote separates wall length and height, ratings, acoustic details, openings, backing, phasing and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
Full-height acoustic partitions differ from partial-height room dividers in head detail, service paths and sound control. So a partition that stops at the ceiling grid loses the sound control it was built for. We frame to the head detail your acoustic design calls for under OBC 9.11, not the detail that closes in fastest.
Rated corridor or suite-separation walls differ from ordinary office fronts under OBC 3.3.1.4 and 3.3.1.7. So two partitions that look identical on the floor plan can carry two different assembly requirements. We match every layer in the approved rated assembly, because a missing layer is what fails your inspection.
Framed glass fronts require manufacturer and structural support details rather than a generic door jamb. So your glazing system drives the framing around it, not the other way around.
Operable walls, demountable partitions and conventional steel-stud walls use different supports and tolerances, so your following trades inherit whichever system's spacing and openings the drawings specify. We confirm which system you're actually buying before takeoff, because pricing one and building another is where office fit-ups go sideways.
A full-height acoustic or rated wall can look finished at the ceiling tile while ending at the grid instead of the structure and approved head detail above. Board and services then have to come back out to complete a wall everyone thought was done. We verify the head condition before track layout.
Part 9 steel-stud provisions apply to your non-loadbearing walls; a loadbearing steel wall moves to a Part 4 design instead under OBC 9.24.1.1. Interior non-loadbearing steel studs need at least 0.46 mm base-steel thickness under OBC 9.24.2.2. Their runners must be at least as thick as the stud with flanges at least 30 mm deep under OBC 9.24.2.3. So a lighter runner under a heavier stud isn't a substitution we make.
Any opening wider than one stud space gets at least double studs at each jamb under OBC 9.24.2.4. Board fasteners must penetrate at least 10 mm through the steel framing under OBC 9.24.3.5. Runners attach to the supporting structure at no more than 600 mm centres under OBC 9.24.3.2, which is what keeps a tall partition from working loose at the head.
Toronto requires scaled, fully dimensioned, signed and dated drawings for non-residential interior alterations, identifying existing and proposed uses, plumbing fixtures, reflected ceilings, wall assemblies, fire separations and the framing above. The permit holder is responsible for requesting the required municipal inspections, so that responsibility doesn't quietly become yours by default.
Your mechanical and sprinkler trades inherit the coordinated wall and ceiling zones we leave behind. Your electrical, data and security trades inherit the in-wall routes and backing. So an uncoordinated route becomes a change order for someone else. Your door, glazing and millwork trades inherit the rough openings, reinforcement and finished planes, which is why we hold those dimensions to the schedule instead of eyeballing them.
Send your existing and proposed plans, wall types, and door and glazing schedules, so the estimate starts from the design basis the inspector will check. Include your Code analysis, occupant load, suite boundaries, exits and barrier-free plan, plus the reflected ceiling and coordinated service plans. Add any acoustic, fire-rated or specialty partition details, and tell us who owns access, phasing and closeout.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Barrie work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Barrie requires a building permit for structural modifications, alterations and additions.
The issued permit package and the work assigned to that inspection stage must be ready. Mandatory inspections follow permit issuance and the stages listed for the project.
Unresolved access approval or an incomplete material route can delay mobilisation. For a detached unit, use the approved site plan to confirm parking and access paths. The quote also needs wall length and height, ratings, acoustic details, openings, backing, phasing and access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across Barrie. See all framing in Barrie →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the current drawings, the property address, permit status and the start window you're working toward. We will review the partition package, flag any missing rated-wall, occupancy or coordination decision, and give you a scope you can actually price against.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides office framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.