Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Second suite and in-law suite framing in King City and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
King City addresses use the Township of King Building Division. The permit package includes an inspection notice sheet listing mandatory stages. Vehicles, materials or equipment in a Township right of way can require a road-occupancy permit.
King requires inspected work to remain visible and may order covered elements uncovered, so the second-suite frame stays accessible through inspection. The inspection sequence, not a municipality-wide housing profile, controls what is presented on site. The issued permit package determines the applicable inspection sequence for the project.
At the address, we verify suite layout, openings, ceiling constraints and separation details. We also confirm the current municipal approval status and the route for studs, engineered members and occupied-site access. That route is checked without assuming municipal road space is available.
The quote separates layout, structural changes, openings, separations, ceiling conditions and access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
A basement suite is constrained by foundation walls, beams, ducts and below-grade openings, while an upper-floor suite depends more heavily on floor-ceiling separation and stair access. That means your engineer may need to settle the load path before material is ordered.
A secondary suite is an additional dwelling unit within a house and follows the OBC provisions specifically written for that condition. That means your quote carries the matching member layout, connector schedule and site handling.
Mississauga separately permits additional units in locations such as basements, garages, upper floors and additions, subject to its municipal rules. That means you get the route supported by the drawings instead of a choice made from habit.
Walls and floor-ceiling framing separating units in a house with a secondary suite may use the continuous smoke-tight Type X gypsum alternative in 9.10.9.16(4). That means your following trades inherit that system's spacing, openings and limits.
A basement may meet the general ceiling height and still fall short under one duct. If that projection drops below the permitted clear height, framing cannot recover the lost space after the mechanical route is fixed in place. We measure to the lowest beam, pipe and duct before the suite layout is released.
Secondary-suite ceiling height must be at least 1.95 m, which means your installed member must match the grade or product shown in the design. Clear height under beams and ducting in a secondary suite must be at least 1.85 m, which means you can verify the material condition before it is enclosed.
Loadbearing studs require Stud, Standard or No. 2 lumber; non-loadbearing studs may use Stud, Utility or No. 3, which means your bearing and connection detail must preserve that capacity. Installed framing lumber must contain no more than 19 percent moisture, which means you can trace the fastening requirement to the actual assembly.
Ontario's Part 9 framing notice includes substantially complete structural framing and HVAC ductwork and piping, which means your sequence must reach that visible hold point before finishes. Mississauga requires plumbing, electrical and HVAC rough-ins to pass before its framing inspection, which means you can plan the following trade around the stated response.
Mississauga checks ceiling heights, rooms, windows, structural openings and fire blocking while the frame is uncovered. That means your mechanical and electrical work may have to be complete before the framing review. Mississauga schedules fire-separation inspection after framing, sound insulation, plumbing and heating but before cover, which means you avoid reopening work the municipality needed to see.
Request the address, zoning confirmation, intended unit arrangement, permit status and municipal registration requirements, which means you give the estimator the current design basis. Request approved floor plans, fire-separation details, exit information and mechanical layouts, which means your takeoff can include the scheduled members and openings. Add the address, permit status and target start window, so you can separate what is ready to price from what still needs a decision.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable King City work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Township of King Building, not York Region, administers the King City permit and inspections.
The issued permit package and the work assigned to that inspection stage must be ready. Keep inspected work visible and follow the mandatory stages on the King permit notice sheet.
Unresolved access approval or an incomplete material route can delay mobilisation. A road-occupancy permit can apply to vehicles, materials or equipment placed in a Township right of way. The quote also needs layout, structural changes, openings, separations, ceiling conditions and access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Framing services across King City. See all framing in King City →
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
On this second suite and in-law suite project in King City, send the drawings, address, timing, and known site conditions. On the King City second suite and in-law suite schedule, Timberr will identify what the scope needs for a reliable quote and framing schedule.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides second suite and in-law suite framing, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.