Built to plan
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Complete framing contractor scope in Aldershot and across the GTA, built to your drawings and the Ontario Building Code. Timberr Framing is licensed, insured and WSIB-covered, rated 5.0 on Google, with a workmanship warranty behind every job.
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Framed from your architectural and engineered drawings, to the plan and the Ontario Building Code, not by rule of thumb.
Engineered lumber, LVL/PSL beams, and connectors chosen for the spans and loads on the plans.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Send the drawings, or just the address and what you are building. We will tell you what is missing and what happens next.
Timberr Framing did an excellent job with our commercial units! We'll definitely be using them again for future projects!
We have worked with Timberr Framing on a few projects, and they continue to impress with their great workmanship and reliable service in our commercial unit. We highly recommend them for all your metal stud framing needs!
Highly recommend to anyone with a stacked townhome project! Outstanding craftsmanship once again Timberr Framing.
I was impressed by Timberr Framing’s skilled craftsmanship during our commercial framing project. They delivered high-quality work and maintained strong structural integrity in our commercial development that required metal framing.
Timberr Framing’s team was not only punctual and dependable but also demonstrated exceptional skills in both addition and commercial framing projects. We'll definitely hire them again!
Timberr Framing has an efficient process and always completes work on time. Their team is highly organized, and our team of developers are always satisfied with the final results.
Aldershot uses Burlington's permit and inspection system. North Aldershot planning policies remain part of Burlington rather than a separate permit regime. Site-plan guidance can circulate work to zoning, engineering, forestry, Conservation Halton and heritage review.
North Aldershot guidance requires survey-based grades, driveway details and site conditions, so the frame setup follows the property survey. North Aldershot policy protects slopes from major cutting, filling and erosion.
At the address, we verify bearing lines, openings and elevations. We also confirm the current municipal approval status and the route for lumber, engineered members and lifting access. That route is checked without assuming municipal road space is available.
The quote separates storey count, spans, openings, engineered members and site access, together with any road, grading, heritage or inspection condition triggered at this property. Timberr schedules the project from the GTA or York Region after those inputs are settled. Unresolved design and access conditions remain named rather than hidden inside the framing allowance.
Full frame from the footings up, to the architect's set and the engineer's beam schedule. These jobs live or die on the load path, because a beam needs at least 89 mm of level end bearing and a loadbearing wall running parallel to the joists has to land on something stiff enough to carry it. So a wall that looks fine on the plan can be quietly overloading the floor underneath.
We trace that path to the footings before we start, not after the second floor is on.
Repetition is the economics of these builds, so the first unit is framed as the template and checked hard before the rest follow. Fire blocking and the separations between units get framed as designed rather than adapted on site, because anything concealed before the inspector sees it can be ordered uncovered.
Half the structure already exists and none of it is square. Permit drawings have to distinguish existing construction from proposed, so we measure what is actually there rather than trusting the original plans. Where new framing ties into old joists, we confirm what is carrying the load before anything is cut.
Steel stud partitions, bulkheads, backing and fire-rated assemblies for offices, retail, restaurants and industrial fit-outs. These sit outside Part 9 of the Ontario Building Code. So the assemblies, the engineering and the notice your municipality needs before framing can be closed in are all different from a house. A contractor who only does houses will find that out late.
The dangerous frame is the one that looks complete while a concentrated load stops at the floor below. A beam post landing between joists can overload a system that was never designed to carry it, and drywall will hide the error perfectly. We trace every beam, post and bearing wall to a footing or designed transfer before that load is built in.
Grade is not interchangeable. A loadbearing stud wall needs lumber graded Stud, Standard or No. 2 while a partition can use No. 3, so the cheaper bundle in the yard is only cheaper until it ends up in the wrong wall. Lumber also has to be at or below 19 percent moisture content when it goes in, which is why we care where it has been sitting before it reaches you.
Spacing follows load, not habit. A 38 by 89 mm exterior wall can sit at 600 mm centres when it carries only a roof and is under 3 m unsupported. That permitted spacing tightens the moment it carries floors or gets taller. That is why a wall spec copied from the garage drawing does not survive on the house.
Connectors are part of the load path, not hardware. A joist framed into the side of a beam needs a hanger or a compliant ledger rather than nails, because the rated capacity only exists with the specified fastener in every hole. A hanger with half its holes empty looks finished while carrying a fraction of the load.
The Code names the notice point: substantial completion of the structural framing together with the heating and air-conditioning ductwork and piping. That single sentence sets your whole sequence, because it means the mechanical trades have to be in before we are finished rather than after. Once notice is given, the municipality has 2 days to respond, excluding weekends and holidays.
So we keep openings and service zones clear, leave the structure and fire blocking visible, and hand over plumb walls, square rooms and openings matching the schedule. Your drywaller inherits our stud spacing and backing. Your window supplier inherits our rough openings. If those are out, you pay for it twice.
The address, project type, floor area and storey count, dimensioned architectural and structural drawings with all revisions, opening schedules, truss and engineered member layouts where they are specified, permit status and your target framing window. If the set is incomplete we tell you which decision is missing and who makes it, rather than burying an allowance in the price.
Ours names what we frame, what another trade supplies, and what has to be settled before we mobilise. Compare the scope, not two totals built on different assumptions.
Clean framing, tight sequencing, and a tidy site, coordinated with concrete, drainage, openings, and surrounding trades, and completed to code where site work is in scope.
Yes, when the drawings, site access and schedule support the project. Timberr takes on suitable Aldershot work from its GTA and York Region service base, with mobilisation tied to the booked address.
It depends on whether the proposed scope is permit work. Burlington, not Aldershot or Halton Region, administers the building permit and inspection.
The issued permit package and the work assigned to that inspection stage must be ready. Keep Burlington-approved drawings and the permit card on site for inspection.
Unresolved access approval or an incomplete material route can delay mobilisation. Use the survey-based site information to confirm grades, driveway details and the actual material route. The quote also needs storey count, spans, openings, engineered members and site access.
Most are not, and that is fine. Send what you have and we will tell you what is missing before it costs you a week on site.
Custom homes, additions, renovations, and multiplexes, framed on site for builders, homeowners, contractors, and property teams.
Send the drawings, the address and your timing. We will come out, walk the site, and give you a free, no-obligation estimate with the scope written down rather than assumed.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured & WSIB-Covered
Send the drawings, or just the address and what you are building. We will tell you what is missing before we price it.
Timberr Framing provides complete framing contractor scope, built to plan with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Timberr Framing supports plan-based framing for commercial, institutional, property, and builder-led projects across Toronto and Ontario.